Year: 2018
Type: article
Abstract: Lean manufacturing isa production strategy that has been used since 1950's. The main concern of thisstrategy is to determine resource of waste and try to eliminate waste.Companies do not only eliminate waste but also they try to keep their competitivenessas high as their competitors. Lean manufacturing has some tools such as ValueStream Mapping, Kanban, Kaizen, 5s, CONWIP etc. to imply over the productionsystem to enhance its effectiveness. The goal of this paper is to apply ValueStream Mapping to improve production line of a textile company as a casestudy. Value stream mapping (VSM) is oneof the most used lean manufacturing technique for illustrating and analyzingthe logic of a production process and it provides companies to see all productionline on the paper. The main idea of VSM is to see the whole system as a picturenot only part by part. In this paper, VSM was used to demonstrate the presentproduction line and imply lean techniques on this map. Our selected company isa textile producer which exports their products from Istanbul to Europe. Weapply 5s principles to reduce lead time and increase productivity. VSM finalresult shows that Production Lead Time (PLT) decreased 14.5 days to 5.2 days byapplying lean techniques.
Authors: Dilşad Güzel, Ahmet Kamil Kabakuş, Sabri ŞİRİN
Language: Turkish
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: diamond
OpenAlex ID: W2952389282
