Work

SmallSat Manufacturing; The Spire "Constant NPI" Model

Year: 2019
Type: conference-paper
Abstract: Producing 100 of anything in 1 year is not considered high volume in most businesses, but in the satellite manufacturing world it is, even if those satellites are 3U cubesats. The additional complications of a variable launch schedule and the need to launch the latest hardware drives a need for a robust but agile process. As with everything at Spire we are addressing this problem with an iterative approach to the 4 main requirements. These are not serially dependant steps, but a group of parallel iterations.
Language: English
Open Access status: green
OpenAlex ID: W2963548660
FWCI: 2.072
Cites:
Cited by: 7
Related to: 10