Work

Penjadwalan Proyek Pada Cv. Karya Guna Pasuruan

Year: 2019
Type: dissertation
Abstract: This research was conducted at CV. Karya Guna Pasuruan. A company engaged in contractor and property that was founded in 1994.. This study aims to analyze the project completion time using CPM Methods CPM (critical path method) and looking for a great the cost of labor on the construction of the MCK Nestle.. The results showed that the project of the construction of the MCK Nestle have the time standard from the company for 150 days. While using the Methods of CPM (critical path method) time can be resolved in the 111 days where the cost of labor of Rp. 58.015.000. Thus network planning using methods CPM can shorten the time of the completion of the project so that it can be effective and efficient in the implementation of the project. After knowing the time it will be easy to calculate the large labor during the project. Project planning using CPM which is simple and can be done by the construction.
Language: Indonesian
Open Access status: green
OpenAlex ID: W2998460179
Cites: 8
Cited by:
Related to: 10