Work

Chloride Transport in Concrete Structural Elements after Repair

Year: 2015
Type: conference-paper
Abstract: This paper deals with the chloride transport in concrete elements after a repair measure in which the concrete cover was partially replaced with a repair material.Numerical calculations are used to establish criteria for the depth to which the concrete cover must be removed if the remaining layer of concrete is contaminated with chlorides.Compliance with these criteria is essential to prevent the residual chlorides causing depassivation of the reinforcing steel, apart from any effect of external chlorides by exposure after the repair measure.The results of ongoing laboratory investigations are presented.These demonstrate a favourable extraction of the chlorides present in the remaining concrete element by the repair layer.It is intended to use the results to develop a concept for evaluating the durability of concrete elements after repair with respect to chloride-induced corrosion of the reinforcing steel.
Language: English
Open Access status: green
OpenAlex ID: W3020987019
FWCI: 1.477
Cites: 1
Cited by: 5
Related to: 10