Application of Building Information Modelling in a tunnelling project and a data exchange with a process controlling software
Year: 2019
Type: conference-paper
Abstract: Building Information Modelling (BIM) is already well known and accepted in the construction of buildings. There are initiatives and pilot projects to also apply BIM for infrastructure projects such as tunnels. However, due the different conditions in tunnelling, where a linear structure is created, the BIM process of building construction cannot be directly adopted. Thus, new BIM processes are required that are tailored to the specific needs of tunnelling projects and that capture the tunnel digitally through all project phases from design to maintenance.In the presentedthis paper the generation of the essential BIM models for capturing a tunnel tunnel construction process in mechanised tunnelling is introduced. In detailMore precisely, a tunnel model with one pipe is modelled where each ring consists of several ring segments. The rings are located along the tunnel alignment to represent the tunnel. Additionally, a 3D ground model is constructed consisting of multiple ground layers. These BIM models are imported into the Desite MD software, which can be used to view and manipulate the BIM models. With the integrated JavaScript functionality of Desite MD, functionalities are presented to exchange data with the process controlling software PROCON, which stores the measured sensor and construction data of the tunnel advance. In one example of the data exchange, measured data from the tunnelling process is integrated into the tunnel BIM model by linking the data to the corresponding segments of the tunnel. Thus, a holistic BIM model is generated during the tunnel advance containing increasing knowledge, which can be applied for the maintenance of the tunnel after the construction is finished.
Language: English
Subfield: Building and Construction
Field: Engineering
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W3033939656
