Commissioning and Operation of the LEP Pretzel Scheme
Year: 1994
Type: article
Abstract: From its start-up in 1989, LEP ran, as designed, with 4 bunches per beam and #at orbits. After 4 days of commissioning activity in October 1992, the regular mode of operation became 8 bunches per beam, thanks to a horizontal separation scheme of the #pretzel" type. Here we describe this transition, starting from the #nal stages of the machine studies which preceded it and concluding with the performance achieved by the end of 1992 and the factors limiting it. Some of the important steps were: the redistribution of betatron phase advance, minimisation of tune-splits between the beams, chromaticitychanges, reduction of residual separations at the interaction points when running for physics at the Z 0 energy, optimisation of pretzel separations at injection and in collision, and equalisation of the bunch currents. Anumber of changes to operational procedures and instrumentation were made. It was shown that, with a suitable optics, the full beam polarization could be preserved on pretzel...
Authors: R. Bailey, J. M. Jowett, W. Kalbreier, D. Wang
Institution: European Organization for Nuclear Research
Language: English
Subfield: Nuclear and High Energy Physics
Field: Physics and Astronomy
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W3044028896
