Integrated Cutting and Packing Heterogeneous Precast Beams Multiperiod Production Planning Problem
Year: 2020
Type: article
Abstract: We introduce a novel variant of cutting production planning problems named Integrated Cutting and Packing Heterogeneous Precast Beams Multiperiod Production Planning (ICP-HPBMPP). We propose an integer linear programming model for the ICP-HPBMPP, as well as a lower bound for its optimal objective function value, which is empirically shown to be closer to the optimal solution value than the bound obtained from the linear relaxation of the model. We also propose a genetic algorithm approach for the ICP-HPBMPP as an alternative solution method. We discuss computational experiments and propose a parameterization for the genetic algorithm using D-optimal experimental design. We observe good performance of the exact approach when solving small-sized instances, although there are difficulties in finding optimal solutions for medium and large-sized problems, or even in finding feasible solutions for large instances. On the other hand, the genetic algorithm could find good-quality solutions for large-sized instances within short computing times.
Institution: Universidade Federal do Ceará
Language: English
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: green
Awards: G29316538, G3418382501
OpenAlex ID: W3080220799
