Limits of Offshore Wind Turbine Installation with the Double Slip Joint: Offshore WTG Tower Lowering and Mating with a Double Slip Joint Connection Using Catchers and Tower Guidance. A Determination of Installation Limits and Exploration of Workability
Year: 2020
Type: article
Author: Maarten van den Berg
Language: English
Field: Energy
Domain: Physical Sciences
Open Access status: closed
OpenAlex ID: W3093670232
