Work

Evaluation of Pollutant Removal Efficiency in Environmentally Friendly Full-scale Constructed Wetlands for Treating Domestic Sewage during Long-term Monitoring

Year: 2009
Type: article
Abstract: A constructed wetland which was composed of aerobic and anaerobic areas was evaluated for 3 years to effectively treat the sewage produced in farming and fishing communities. For 3 years in a constructed wetland, biochemical oxygen demand(BOD), chemical oxygen demand(COD), suspended solids(SS), total nitrogen(T-N), and total phosphorus(T-P) in effluent were 0.2${\sim}$11.8, 1.0${\sim}$41.9, 1.1${\sim}$6.5, 4${\sim}$60 and 0.02${\sim}$3.51 mg/L, respectively. Removal rate of BOD, COD and SS in effluent were 97, 92 and 99%, respectively, in the third year. As time goes by, removal rate of T-N and T-P in treated water in aerobic area and effluent were gradually increased in a constructed wetland. In the third year, removal rate in effluent were 62 and 73%, respectively. By the seasons, removal rate of BOD, COD, SS, T-N and T-P were 97${\sim}$98, 87${\sim}$91, 99, 43${\sim}$61 and 76${\sim}$86%, respectively. Removal rate of BOD, COD, SS and T-P were not affected by the seasons, but that of T-N in winter and spring were decreased than the other seasons.
Language: Korean
Open Access status: bronze
OpenAlex ID: W836593139
FWCI: 1.488
Cites: 4
Cited by: 4
Related to: 8