LHC transfer lines and injection systems
Year: 2014
Type: article
Abstract: The status and commissioning plans of the transfer line and injection hardware are presented with focus on the injection dump and kickers. Modifications of the beam loss monitoring in the injection region, its readiness for the start-up and commissioning strategy are shown. A new interlock strategy for the injection protection elements and the injection septum is introduced. The expected transfer line stability and possibilities to improve the turnaround with optimized SPS supercycles for LHC injection are discussed.
Authors: Wolfgang Bartmann, G. Le Godec, Anton Lechner, Markus Zerlauth, Kain, Chiara Bracco, M. Meddahi, A. Masi, S. V. Grishin, R. Losito, Christos Zamantzas, N Voumard, M. Taborelli, J. Uythoven, B. Goddard, Antonio Perillo‐Marcone, M.J. Barnes, Nicolas Magnin, B. Dehning, Eva Barbara Holzer, S. Cettour Cave, R. Folch, E. Carlier
Language: English
Subfield: Nuclear and High Energy Physics
Field: Physics and Astronomy
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W3124473409
