Year: 2021
Type: article
Study design: Observational Study
Abstract: In any construction project there are certain hindrances which affect the duration of project and obviously on the total cost.The constraints in any project limit their achievement of high performance.The aim and scope of this study is to identify the major constraints and their level of impact on the construction projects.For this purpose a proper set of questionnaire is sent to different government bodies as well as private contractors.These questionnaires were also sent to individual involved in any project from top to bottom level.The responses from everyone is recorded and used as a major tool of this study.From the responses it was observed that there are five types of constraints viz.legal constraint, social constraints, technical constraint, environmental constraint and economic constraint.Each constraint may occur individually or they may work as a series of problems.It was observed that at every stage there may be some constraint which may affect the total duration as well as total cost of the project.The management should be adaptive and alert for any situation to encounter the constraints.
Author: Uttpal Rai
Institution: Sam Higginbottom Institute of Agriculture
Language: English
Field: Decision Sciences
Domain: Social Sciences
Open Access status: diamond
OpenAlex ID: W3127548617
