Static Analysis of Soral Embankment Dam During Operation Using Precise Damtool Data and Finite Element Method
Year: 2020
Type: article
Abstract: The construction of the embankment dams involves many complex factors that make the design and implementation of these massive structures
one of the most important projects in geotechnical engineering. During the construction phase and the operation of the embankment dams, various
types of stresses are exposed, including the stresses caused by the dam settlement and the stresses of the necessary considerations, and the safety
plan is implemented. Changing variables in terrestrial environments such as calculating the amount of water loss in the dam, controlling critical
output gradients, graphical drawing of intensity, magnitude, and direction of movement of the dam body or foundation, calculating the type and
dimensions of drainage systems and water was performed by software Plaxis2D and compared the exact instrument results. In this study, static
analysis of soral embankment dam is performed using hardening soil model (HS), which is an elastoplastic model. The results of the research show
that the maximum total of vertical stress and effective stress at the end of the construction of dam structures is equal to 1480 and 977 kPa and the
maximum total of vertical stress and effective stress in the steady-state leakage stage is equal to 1150 and 887 kPa, which will occur on a rocky bed
in the core area. The vertical stress curves indicate changes in the stress values in the transition from the upstream pebble shell to the core and the
core to the filter and the downstream pebble shell. The reason for this is the difference between the hardness of the deformation (elastic modulus)
in the core and filters and shell areas. The areas with greater hardness have less settlement than softer areas, leading to unequal settlement between
the two areas. The consolidation analysis has shown that the proposed timeline is suitable for construction (20 cm thick embankment layers per
day) and that the pore pressure values are such that there is no sustainability problem for the dam. In general, the results of static analysis confirm
the proper behavior of the dam structure for post-construction conditions and stable leakage conditions. The displacement and stresses and the
permeable water pressure are acceptable and ensure the stability of the dam.
Source: Journal of Critical Reviews
Author: Alireza Sharafi
Language: English
Topic: Dam Engineering and Safety
Subfield: Civil and Structural Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: diamond
OpenAlex ID: W3130645448
