Work

Current strategy for highway construction in the Republic of Serbia

Year: 2014
Type: article
Abstract: In order to achieve the economic development of the Republic of Serbia, it is necessary to provide adequate traffic infrastructure, particularly highways. The second lane on the northern branch of Corridor X (E-75) from Horgoš to Belgrade has been completed, and the construction works on the eastern branch (E-80) from Niš to the Bulgarian border and on the southern branch (E-75) from Leskovac to the Macedonian border are ongoing. Works are also in progress on the Belgrade bypass. Works on the E-763 ("Corridor 11") are executed between Obrenovac and Preljina. Continuation of this road towards Montenegro is being prepared. Also preparations for the highway on the E-761 from Pojate to Preljina are ongoing.
Language: English
Open Access status: green
OpenAlex ID: W3133423780
FWCI:
Cites:
Cited by:
Related to: 9