Year: 2020
Type: article
Abstract: This article examines the phenomenon of the siltation of the Zardezas dam, located in the prefecture of Skikda. Investigations were carried out at the level of the dam as well as its watershed. Data from the bathymetric surveys were made available to us by the services of the National Dams Agency. The results obtained showed that over time, the capacity of the dam has greatly diminished and that currently does not exceed ¼ of its initial capacity. It should be noted that during the period: 2003-2006, the rate of siltation reached 0.4 million m3/year. At the same time, a volume of 0.3 million m3 was removed from the reservoir. The dam is silting and increasingly likely to be filled to 100%.
Source: Larhyss journal
Authors: Abdelouahab Toumi, Boualem Rémini
Institutions: University of Guelma, University of Blida
Language: English
Topic: Dam Engineering and Safety
Subfield: Civil and Structural Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: hybrid
OpenAlex ID: W3134475923
