Pareto-scheduling with family jobs or ND-agent on a parallel-batch machine to minimize the makespan and maximum cost
Work
Year: 2021
Type: article
Source: 4OR
Authors Yuan Gao, Jinjiang Yuan, C.T. Ng, T.C.E. Cheng
Institutions Zhengzhou University, Hong Kong Polytechnic University
Cites: 30
Cited by: 4
Related to: 10
FWCI: 0.543
Citation percentile (by year/subfield): 64.36
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Sustainable Development Goal Decent work and economic growth
Open Access status: green
Grant IDS 11771406, 2019M652555