Crack cycling tests on undercut anchors for application in nuclear safety related structures with different tension loading protocols
Year: 2015
Type: conference-paper
Abstract: Post-installed mechanical anchors are often required to connect structural or non-structural systems with the reinforced concrete structures in nuclear power plants (NPP).Considering the high safety requirements for nuclear safety related structures, German guideline for anchorages in nuclear power plants (DIBt, 2010) gives recommendations for testing and qualification of anchors to be used in NPP.There is a high probability that the fastener is intercepted by the crack before the earthquake strikes.Consequently, the seismic loading results in cycling of applied load simultaneously with opening and closing of the crack intercepting the anchor.For simplification of the test setup, DIBt (2010) guideline allows the anchors to be tested by separate load and crack cycling tests.The crack cycling tests as per DIBt (2010) guidelines requires the crack to open and close for 10 cycles between the maximum and minimum specified crack widths, while the load on the anchor is kept constant.This assumption of constant load during crack cycling is deemed conservative.In this work, crack cycling tests on undercut anchors qualified for use in NPP are performed with three different tension loading protocols namely, (i) constant load during crack cycling; (ii) load cycling in-phase with crack cycling, and (iii) load cycling out-of-phase with crack cycling.The test results are compared with similar tests on headed studs available in literature.The results indicate that depending on the anchor type, the assumption of constant load during crack cycling may not always be conservative considering the displacement demands on the anchor.
Authors: Akanshu Sharma, Vinay Mahadik, Jan Hofmann
Language: English
Subfield: Civil and Structural Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W3199525210