An Application of a State of the Art 3d-cad-modeling and Simulation System for the Decommissioning of Nuclear Capital Equipment in Respect of German Prototype Spent Fuel Reprocessing Plant Karlsruhe
Year: 2002
Type: article
Abstract: Siempelkamp Nukleartechnik GmbH is engaged in the optimization of decommissioning processes for several years. With respect of the complexity of the projects, the time frame and the budget it is necessary to find more effective ways to handle those tasks in the near future. The decommissioning and dismantling will be achieved in six steps taking into account that some processing equipment can be dismantled before and the rest only after the High Active Liquid Waste Concentrate (HAWC) has been vitrified approximately by mid of 2005. After the successful beginning of the remote dismantling of the main process cells from March 2000, the next remote dismantling project at the WAK was initiated April 2000.
Authors: Matthias Schulz, U. Boese, Kathryn Doering
Language: English
Subfield: Safety, Risk, Reliability and Quality
Field: Engineering
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W332941475
