Work

Fabrication and Testing Status of Cebaf 12 Gev Upgrade Cavities

Year: 2011
Type: article
Abstract: The 12 GeV upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Laboratory (JLab) is under way. All cavities have been built by industry and are presently undergoing post-processing and final low and high power qualification before cryomodule assembly. The status is reported including fabrication-related experiences, observations and issues throughout production, post-processing and qualification.
Language: English
Open Access status: green
OpenAlex ID: W33555784
FWCI:
Cites:
Cited by:
Related to: 10