Year: 1983
Type: article
Abstract: A class of permutation scheduling problems are discussed. Suppose that a permutation scheduling problem without precedence constraints is given a solution as a dominance relation, i. e. an optimal solution is obtained by arranging jobs according to the dominance relation. Then, a sufficient condition for the same problem imposed a series-parallel precedence constraint to be solved by a series-parallel algorithm of 0 (n log n), n: the number of jobs, is clarified. Five example problems are shown to satisfy this sufficient condition. Two of them are a single machine scheduling problem minimizing total weighted completion time and a two-machine flow-shop scheduling problem minimizing the maximum completion time, both have been given series-parallel algorithms elsewhere. The other three are a problem minimizing the maximum cumulative cost, a single machine scheduling problem minimizing the maximum lateness and a single machine scheduling problem minimizing total discounted cost. These three problems have 110t been known to have series-parallel algorithms.
Source: HOKUDAI ECONOMIC PAPERS
Author: Yasuki Sekiguchi
Language: English
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W343482938
