Year: 2014
Type: conference-paper
Abstract: A recent empirical study demonstrated that the process of allocating project managers to projects (PM2P) in multi-project environments of Botswana was not effective. This inspired the authors to seek to understand the structure of the PM2P process with a view of proposing improvements to increase effectiveness. A conceptual model was developed and used in this study, which focusses on using the developed model as a theoretical lens to study the process in a large company, using the case study method. Via an enumeration, qualitative and quantitative data were collected from four project directors and eleven senior level executives through in-depth semi-structured interviews. The analysis of the quantitative data (using univariate descriptive analysis) and qualitative data (using content and thematic analysis) revealed weaknesses in the existing PM2P process demonstrated in five ways namely: (1) absence of documented and specific competencies required of project managers in various roles, (2) lack of management tools and techniques to match project managers to projects, (3) prevalence of ad-hoc projects, (4) lack of consideration of a comprehensive list of inputs and (5) lack of accountability for outputs. The strengths in existing PM2P
Authors: Lone Seboni, Apollo Tutesigensi
Institution: University of Leeds
Language: English
Field: Decision Sciences
Domain: Social Sciences
Open Access status: green
OpenAlex ID: W387669242