Year: 2003
Type: article
Abstract: At Fermilab, a 4000-ft long underground complex has recently been constructed for a high-energy physics experiment. The complex is sited up to 350 ft, below grade principally in bedrock. The rock excavations were mined by TBM and drill and blast methods and supported by a combination of rock bolts, dowels and shotcrete. Water control was achieved using a combination of pre- and post-excavation grouting, drainage systems, drip shielding and air desiccation measures.
Authors: C. Laughton, Michael Bruen
Language: English
Topic: Tunneling and Rock Mechanics
Subfield: Civil and Structural Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W39840865