Work

Construction of the NuMI underground laboratory facilities

Year: 2003
Type: article
Abstract: At Fermilab, a 4000-ft long underground complex has recently been constructed for a high-energy physics experiment. The complex is sited up to 350 ft, below grade principally in bedrock. The rock excavations were mined by TBM and drill and blast methods and supported by a combination of rock bolts, dowels and shotcrete. Water control was achieved using a combination of pre- and post-excavation grouting, drainage systems, drip shielding and air desiccation measures.
Authors: C. Laughton, Michael Bruen
Language: English
Open Access status: green
OpenAlex ID: W39840865
FWCI:
Cites:
Cited by: 1
Related to: 10