Work

Industrial engineering

Year: 2015
Type: dataset
Abstract: Production scheduling has attracted the interest of production economics communities for decades, but there is still a gap between academic research, real-world problems, operations research and simulation.Genetic Algorithms (GA) represent a technique that has already been applied to a variety of combinatorial problems.Simulation can be used to find a solution to problems through repetitive simulation runs or to prove a solution computed by an optimization algorithm.We will explain the application of two special GAs for job-shop and resource-constrained project scheduling problems trying to bridge the gap between problem solving by algorithm and by simulation.Possible goals for scheduling problems are to minimize the makespan of a production program or to increase the due-date reliability of jobs or possibly any goal which can be described in a mathematical expression.The approach focuses on integrating a GA into a commercial software product and verifying the results with simulation. PROBLEM DESCRIPTIONThe resource-constrained project scheduling problem (RCPSP) is one of the classic scheduling problems of operations research.Already very simple special cases of the job-shop problem (JSP) which represents a special case of the RCPSP are ΝΠ-complete.An instance of JSP with ten jobs to be processed on ten resources (machines) formulated in 1963 remained open for more than 25 years.It was finally solved by a branch-and-bound algorithm.We explain different computed solutions by two GAs in relation to simulation results.The GAs were developed to find a solution with the maximum results for a given set of production logistical objectives.The GAs and their operators are tested on benchmark instances and real-world data from a one-of-a-kind manufacturing department of a major German company.To have the possibility to work with real-world data we extended Microsoft Project with GA and a range of other aspects: A new graphical user interface is introduced to support users with a guided wizard describing the problem for which an optimal schedule is to be found.It includes different aggregation operators for the combination of objectives.Furthermore, the efficiency of the algorithm was compared to benchmark tests available in literature. 1.1 Characteristics of resource-constrained project scheduling problemsMany jobs in industry and elsewhere require a collection of activities to be completed while satisfying temporal, resource and precedence constraints.Temporal constraints demand some activities, or a set of them to be started or finished before or only after a certain point in time.Each activity uses an amount of renewable and non-renewable resources and is constrained by the fact that the total resource allocation per time-unit cannot exceed the total resource availability.Renewable resources include all resources of which a specified number of units is available for every period of the planning horizon (machinery, human resources) whereas non-renewable resources (such as material) are the ones of which only a fixed amount of units is available throughout the whole planning horizon.Precedence constraints refer to the technologically imposed winding-up of the operations (activities) within a production order (job).The objective is to create a schedule specifying when each operation within a production program is to begin (or finish) and what resources it will use in order to satisfy all constraints while 2238
Author: Thomas, Marlin U.
Language: English
Open Access status: green
OpenAlex ID: W417890471
Cites: 24
Cited by: 20
Related to: 10