Year: 1988
Type: conference-paper
Abstract: We discuss the issues about the interdependency between code scheduling and register allocation. We present two methods as solutions: (1) an integrated code scheduling technique; and (2) a DAG-driven register allocator. The integrated code scheduling method combines two scheduling techniques—one to reduce pipeline delays and the other to minimize register usage—into a single phase. By keeping track of the number of available registers, the scheduler can choose the appropriate scheduling technique to schedule a better code sequence. The DAG-driven register allocator uses a dependency graph to assist in assigning registers; it introduces much less extra dependency than does an ordinary register allocator. For large basic blocks, both approaches were shown to generate more efficient code sequences than conventional techniques in the simulations.
DOI: 10.1145/55364.55407
Authors: J. R. Goodman, W.-C. Hsu
Institution: University of Wisconsin–Madison
Language: English
Subfield: Hardware and Architecture
Field: Computer Science
Domain: Physical Sciences
Open Access status: bronze
OpenAlex ID: W4236145149
