Evaluation of the cost effects on nuclear power plant construction resulting from the increase in seismic design level. Technical report

Year: 1981
Type: report
Abstract: This report presents the incremental cost of an 1100-to-1300-MWe nuclear power plant as a function of a range of seismic design requirements. The range of seismic intensity investigated is between 0.2-g and 0.6-g zero period ground acceleration for a safe shutdown earthquake. Two sets of costs are considered: one at a site where foundation liquefaction is a design consideration and the second where liquefaction is not a design consideration. Best estimate direct plus A/E (architect/engineer) engineering costs for a nonliquefaction site are from $16,200,000 to $43,800,000 (1977 dollars) and in the seismic range between 0.2-g and 0.6-g safe shutdown earthquake zero period ground acceleration. For sites where liquefaction is considered, the best estimate range is from $24,400,000 to $55,800,000. Percent of total plant costs range from 3.2 to 8.8 for nonliquefaction sites to 4.8 to 11.2 to liquefaction sites. These percentages are based on total direct and A/E engineering costs for the power-generating facility. If only those direct and A/E engineering costs associated with the nuclear steam supply system (nuclear island) are considered, the percentage increase associated with the seismic requirement would be approximately double those given above.
Author: J Stevenson
Language: English
Open Access status: green
OpenAlex ID: W4295711315
Cites:
Cited by: 4
Related to: 10