Work

Bi̇r İçecek Fi̇rmasinda Ti̇p Dönüşüm Süreleri̇ni̇n Kisaltilmasina Yöneli̇k Uygulama

Type: article
Abstract: In companies ,which have large product range, one of the most important problems encountered in production is the long time spent in production preparation. From one product to another during the production process,conversion of types is called the preparatory activities in the material and machine settings. These consist of activities such as setting up, adjusting, installing, cleaning the necessary equipment. Type conversion times become a serious problem in businesses where the product range is wide. The bottling line of a beverage company is discussed in the study. A mathematical model has been developed in order to reduce the time losses resulting from the type conversion times in the line and to increase the line efficiency. The model is solved with the packet program GAMS to find the product orders that will minimize set up time and total lateness. The results of the solution are compared with the current situation and the contribution to the company is stated
Source: DergiPark
Institution: Gazi University
Language: English
Open Access status: green
OpenAlex ID: W4298282955
Cites: 3
Cited by:
Related to: 9