Abstract: This is the final report for a DOE sponsored project (DE-FE00031846) where MTR, Sargent & Lundy (S&L), Trimeric Corporation (Trimeric), in cooperation with Basin Electric Power Cooperative (BEPC), and Electric Power Research Institute (EPRI), completed a full-scale Front End Engineering and Design (FEED) study to evaluate the retrofit of MTR’s membrane-based post-combustion carbon dioxide (CO2) capture technology to the BEPC Dry Fork Station (DFS) Unit 1. The capture plant is designed to treat the entire flue gas flow from DFS; it is estimated that this system will capture 6,560 tonnes per day (TPD) of carbon dioxide. The overall goal of the project was to develop an AACE Level 2 Capital Cost Estimate with an accuracy of ±15% to demonstrate the economic feasibility of constructing and operating the MTR CO2 capture plant.
DOI: 10.2172/1897679
Authors: Tim Merkel, Brice Freeman, Richard Baker, Alicia Breen, Pingjiao Hao, Thomas Hofmann, Paul St-Martin
Institution: Membrane Technology & Research (United States)
Language: English
Subfield: Filtration and Separation
Field: Chemical Engineering
Domain: Physical Sciences
Open Access status: green
Funder: U.S. Department of Energy