Work

Justification of the Distance Between Short Tops on the Working Horizons of the Mine When Using Loading and Delivery Machines

Year: 2023
Type: article
Abstract: To the article the worked out is driven on the basis ofresearches, methodology of choice of optimal distancebetween crossheadings in mine horizon at development ofhigh-dipping tendon deposits of different power with the useof self-propelled technique and offered graphic results forengineering calculations.
Language: English
Open Access status: green
OpenAlex ID: W4324341887
FWCI:
Cites:
Cited by:
Related to: 10