Maximum Tolerated Number of Simultaneous BEV Charging Events in a Typical Low-Voltage Grid for Urban Residential Area
Year: 2023
Type: article
Abstract: In this paper, we determine the maximum number of battery electric vehicles (BEVs) that can be charged simultaneously at full power during peak load hour without overloading transformer and lines or causing an unacceptable voltage drop in the low-voltage (LV) grid. In order to predict the BEVs charging demand, an application that takes into account the random user’s arrival time and the initial battery state of charge (SOC) was developed using the C++ programming language and the Qt toolkit. The network analysis was then carried out using the Quasi-Dynamic Simulation (QDS) toolbox in DIgSILENT PowerFactory on a typical German LV grid for a metropolitan urban area. The simulation findings indicate that the value of simultaneity factor (SF) plays an important role in identifying the most robust and weakest grid’s bottlenecks. There is currently no immediate threat of electromobility pushing the parameters of the grid to their unacceptable limits; however, it is essential to examine the LV grid’s bottlenecks and gradually prepare them for the ramp-up of BEVs. In the short term, the bottlenecks can be removed using conservative planning and operating principles; however, employing novel approaches will be crucial in the longer term.
Source: World Electric Vehicle Journal
DOI: 10.3390/wevj14070165
Institution: RheinMain University of Applied Sciences
Language: English
Subfield: Electrical and Electronic Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: gold
Estimated APC paid: $1,243
OpenAlex ID: W4382135188
