Year: 2010
Type: article
Abstract: We consider a single machine scheduling problem to minimize a multiple objective function; sumof earliness, tardiness and completion time. As this problem is complete NP-hard we propose a branch andbound algorithm to obtain an optimal solution. The implementation of optimizing algorithms dose seen to bepromising but it need longer time. Thus we tackle the problem with local search methods: descent method,simulated annealing and threshold acceptance. The performance of these heuristic methods is evaluated on alarge set of test problems, and the results are also compared with these obtained by genetic algorithm andhybrid method which is combining the simulated annealing with the genetic algorithm. The best results are obtained with the hybrid method. We solved the problem optimality with up to 35 jobs and approximately with up to 150000 jobs.
Institutions: University of Kufa, Mustansiriyah University
Language: English
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: diamond
OpenAlex ID: W4384461407
