Year: 2008
Type: article
Abstract: The experience from single production shows a de-lay as the result of complexity of production conditions. The influence of number of factors in production causes significant deviation of due dates which leads to un-
Source: Metalurgija
Authors: Roberto Lujić, Tomislav Šarić, Goran Šimunović
Language: Croatian
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: gold
OpenAlex ID: W2190039744
