The influence of additionality and time-matching requirements on the emissions from grid-connected hydrogen production
Year: 2024
Type: article
Abstract: The United States’ Inflation Reduction Act (IRA) includes a hydrogen (H2) production tax credit (PTC) to subsidize low-carbon H2 up to $3/kg. It is hard to quantify the emissions impact of electrolyzers using grid electricity and contracting “additional” grid-interconnected renewable electricity; the H2 producer offtakes its electricity supply from newly installed low-carbon generators that are not co-located with the electrolyzer. Recent research offers conflicting guidance on qualifying time-matching requirements, which we find can be explained by differences in the modeling of additionality requirements. One approach considers any resources that are not operating prior to the installation of the electrolyzer to be additional — i.e., H2 and non-H2 electricity demand “compete” for entering renewables. Another approach enforces a stricter definition of additionality by only considering low-carbon electricity supply that would otherwise not be deployed without H2 production to be additional — we call this a “non-compete” framework. We model both approaches for case studies of the Texas and Florida grids and confirm that the additionality framework drives the consequential emissions impact of H2 production. We estimate significantly less consequential emissions under an annual time matching requirement in the “non-compete” framework. Introducing an upper limit to the electrolyzer’s capacity factor can reduce consequential emissions with annual time-matching under the “compete” framework. We argue that because the demand for electrolytic H2 is still relatively small, today’s context more closely resembles a “non-compete” framework and, thus, a low consequential emissions impact with annual time-matching is likely. However, as demand for electrolytic H2 grows, the risk of a higher consequential emissions impact increases under annual time-matching, as the paradigm shifts to resemble the modeled “compete” framework. Hence, we argue for a “phased approach” in the requirements for the attribution of the PTC: annual matching in the near term with a re-evaluation leaning towards hourly matching later on in the decade.
Source: Nature Energy
Institution: Massachusetts Institute of Technology
Language: English
Subfield: Energy Engineering and Power Technology
Field: Energy
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W4390671248
