A two-stage stochastic programming model for lot-sizing with onsite generation of renewable energy
Year: 2023
Type: conference-paper
Abstract: One way to achieve energy efficiency in manufacturing consists of equipping plants withon-site renewable energy generation systems to partially power industrial processes. However,renewable energy sources are highly intermittent and their availability is difficult to be predictedaccurately. We thus investigate an integrated industrial production planning and energy supplyproblem under uncertain renewable energy availability. We propose a two-stage stochasticprogramming model for this problem. The first decision stage consists of building a productionplan for a proportional lot-sizing and scheduling problem in a single-machine multi-item setting.The second decision stage considers a discrete set of scenarios representing potential realizationsof the stochastic generation of renewable energy over the planning horizon and aims at buildingan energy supply plan for each scenario. Computational experiments will be presented to showthe practical efficiency of the proposed approach.
Source: HAL
Language: English
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W4390797189
