Year: 2005
Type: article
Abstract: The results of feasibility study are given in respect of heat generating plant (co-generating plant) capacity selection on the basis of Gas-Piston Unit for a specific heating boiler house of UE «Minskkommyteploset» in the paper. Keeping in mind the current situation at the power supply market in theRepublicofBelarusthe most profitable for heat supply enterprises are the variants with application of plants having heating capacity that corresponds to the base load of Hot Water Supply system or having electric power that covers boiler house auxiliaries.
Authors: V. A. Sednin, A. V. Sednin, A. A. Shimoukovich
Institution: Belarusian National Technical University
Language: English
Subfield: Energy Engineering and Power Technology
Field: Energy
Domain: Physical Sciences
Keywords: feasibility study, heat supply enterprises
Open Access status: green
OpenAlex ID: W4391989264
