Work

Metaheuristics and breakdown tolerance in the context of embedded environment

Year: 2020
Type: dissertation
Abstract: Technological developments, along with the emergence of Industry 4.0 allow for newapproaches to solve industrial problems, such as the Flexible Job-shop SchedulingProblem (FJSP). The scheduling should deal with a smart and distributed manufacturingsystem supported by novel and emerging manufacturing technologies such as Cyber-Physics Systems (connected embedded systems). The scheduling research needs toshift its focus to smart distributed scheduling modeling and optimization. In order totransferring traditional scheduling into smart distributed scheduling, we aim to answerthese question first: what traditional scheduling methods and optimization algorithmscan be combined and reused with connected embedded systems. In this sense, develop anadaptable optimization algorithm into Embedded system is a highly promising approachto solve this problem before a distributed solution.The objective of this thesis is to provide a flexible optimization algorithm, able to makedecisions to adapt to changes in the work environment (to communicate with the dynamicenvironment) and deal promptly with unexpected and internal uncertainties failures. Inorder to accomplish these goals, we move forward in the following way:• First, we supply an effective solution resolution to the FJSP by utilizing populationbased metaheuristics (P-metaheuristics) and make a comparison of thesealgorithms to eventually find out that the edited model of basic PSO (MPSO) mightbe the most suitable method to resolve problems. An improvement of the run-timeof the serial PSO and a simulation-based comparison of P-metaheuristics for FJSPeither with or without a fuzzy processing time are done.We are essentially studyingsensitivity to the population size and generations number.• Second, we provide the MPSO to solve FJSP: Firstly, we make an analysis andimprove the particle coding under the problem (PSO-OMS and PSO-JMS for FJSPare proposed). The results of the experiment prove that PSO-OMS gives the bestresults in a minimum run time with a guarantee of particles convergence. Optimizationof CPU time is taken into account and the general framework is addressed with the five types of constraints which are considered here: 1) the task executiontime constraint (MS) 2) the machine load constraint (workload) 3) CPU time 4) thenumber of particles that reaches the minimum (global best) 5) and the nature ofconvergence of the particles.• Third, we introduce the FJSP with machine breakdown problem. Then we use thePSO-OMS and enhance this algorithmic performance to solve the FJSP under machinebreakdown. The robustness and stability of the rescheduling are guaranteedwith the quality of result obtained.• Fourth, a modified version of PSO-OMS called Two-level PSO is proposed for thepurpose of preparing a PSO variant for embedded applications.• Finally, we are interested to migrate this implementation (Two-level PSO) to anembedded platform. Then we propose an embedded two-level PSO (E2L-PSO)variant adaptive to a dynamic embedded system under these constraints: 1) thetask execution time (MS) 2) the machine load (workload) 3) CPU time 4) memoryconstraint 5) and feasibility in real time.
Source: HAL
Author: Zarrouk, Rim
Language: English
Open Access status: green
OpenAlex ID: W4393351184
Cites: 133
Cited by:
Related to: 10