Work

Optimum Launch Power in Multiband Systems

Year: 2024
Type: preprint
Abstract: We investigate the residual throughput penalty due to ISRS, after power-optimization, in multiband systems. We show it to be mild. We also revisit the launch power optimization 3-dB rule. We find that using it is possible but not advisable due to increased GSNR non-uniformity.
Language: English
Open Access status: green
OpenAlex ID: W4400611600
Cites:
Cited by: 1
Related to: 10