Abstract: We present a stochastic programming model for informing the deployment of ad hoc flood mitigation measures to protect electric substations prior to an imminent and uncertain hurricane. The first stage captures the deployment of a fixed number of mitigation resources, and the second stage captures grid operation in response to a contingency. The primary objective is to minimize expected load shed. We develop methods for simulating flooding induced by extreme rainfall and construct two geographically realistic case studies, one based on Tropical Storm Imelda and the other on Hurricane Harvey. Applying our model to those case studies, we investigate the effect of the mitigation budget on the optimal objective value and solutions. Our results highlight the sensitivity of the optimal mitigation to the budget, a consequence of those decisions being discrete. We additionally assess the value of having better mitigation options and the spatial features of the optimal mitigation.
Source: IISE Transactions
Institution: The University of Texas at Austin
Language: English
Subfield: Civil and Structural Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: green
Funder: University of Texas at Austin
OpenAlex ID: W4401975613