Investigate–Design–Build Solves Suspected Leak in a 72-in. PCCP Transmission Main under the Trinity River in Dallas, TX
Year: 2024
Type: conference-paper
Source: ASCE Pipelines Conference
Authors: Richard Bailey, Luis Bodington, Erick Steitle, Mike Larsen, Murat Engindeniz
Language: English
Subfield: Civil and Structural Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: closed
OpenAlex ID: W4402059776
