A new composite heuristic to minimize the total tardiness for the single machine scheduling problem with variable and flexible maintenance
Year: 2024
Type: article
Abstract: Inspired by a real-world maintenance/job scheduling issue coming from the semiconductor industry, the present paper proposes a new heuristic algorithm structure for the single machine scheduling T-problem with flexible and variable maintenance, job release dates and sequence dependence setup times. Considering the typical short-term production planning needs, a single maintenance problem has to be scheduled within a certain time interval, along with a set of jobs so as to minimize the total tardiness. A twofold contribution emerges from the present paper. First, four mixed-integer linear programming models are developed for the problem at hand and compared in terms of time to convergence and computational complexity. Second, a novel heuristic algorithm, which has been configured into three distinct variants, has been compared with 17 alternative heuristics from the relevant literature based on a comprehensive experimental campaign. The numerical results allow the selection of the most suitable MILP model and confirm the effectiveness of the proposed heuristic approach.
Source: Computers & Operations Research
Language: English
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: hybrid
Estimated APC paid: $3,470
OpenAlex ID: W4402535790