Year: 2024
Type: article
Abstract: The aim of the article is to verify the feasibility of placing large-scale (up to 100 MWe) water electrolysis technology unit inside, or in the proximity of a domestic nuclear power plant. The possible location is investigated from technological, logistic and nuclear-safety points of view.
Source: Chemické listy
DOI: 10.54779/chl20240491
Institutions: Research Centre Rez, Nuclear Research Institute Rez (Czechia)
Language: English
Subfield: Energy Engineering and Power Technology
Field: Energy
Domain: Physical Sciences
Open Access status: diamond
OpenAlex ID: W4402553534
