Year: 2024
Type: conference-paper
Abstract: With the aim of exploring the dynamic process of the relationship between river water and groundwater, a mathematical model for the unstable seepage process of groundwater under sudden changes in river water level is established. Taking the No. 5 rubber dam reservoir area of the Bahe River as an example, the variation of groundwater level around the reservoir area after the rubber dam storage is analyzed, and the relationship between the amount of groundwater replenished by the river and time is simulated, Calculate the changes in groundwater level around the Bahe River and the amount of seepage in the Bahe River after the rubber dam is filled with water.
DOI: 10.1117/12.3044638
Author: Cong Ma
Language: English
Subfield: Environmental Engineering
Field: Environmental Science
Domain: Physical Sciences
Open Access status: gold
OpenAlex ID: W4402888925
