Year: 2024
Type: article
Abstract: The construction industry faces challenges of labor shortages and safety concerns. Machine control (MC) technology offers a solution, particularly for graders in earthmoving operations. This study introduces a path-planning algorithm using initial site data, 3D target models, and equipment specifications to create optimal work paths for graders. The algorithm minimizes data exchange and adjusts for varying road widths and curves, enhancing grading efficiency and accuracy. A case study on a road construction site in South Korea validated the algorithm’s practical application. The proposed system aims to improve construction efficiency, safety, and cost-effectiveness, contributing to the advancement of construction automation technology.
Source: Applied Sciences
DOI: 10.3390/app14209432
Language: English
Subfield: Building and Construction
Field: Engineering
Domain: Physical Sciences
Open Access status: gold
Estimated APC paid: $2,728
OpenAlex ID: W4403517245
