Design And Build Project Risk Analysis at Tugu Pal 0 Stage II Project Construction

Year: 2024
Type: article
Abstract: The implementation of the design and build method in the Phase II Pal Nol Monument construction project, managed by the Public Works and Spatial Planning Agency (PUPR) of South Kalimantan Province, aims to analyze the risks associated with the design and construction processes. This project, which utilizes an integrated design and build construction method (multi-year), is located on Jl. Dharma Praja within the South Kalimantan Provincial Office Area and executed by the contractor KSO ADHI-PUTRA. A comprehensive risk mitigation strategy for the project includes detailed work planning, effective coordination, periodic evaluation, a thorough understanding of design specifications, continuous risk analysis, flexible contingency plans, and strong communication with government entities and stakeholders. Keywords: Risk Analysis, Design and Build, Construction, Tugu PAL 0 Stage II
Language: English
Open Access status: diamond
OpenAlex ID: W4403616111
FWCI: 0.316
Cites:
Cited by: 1
Related to: 10