Work

Fermilab high-intensity neutrino program: present and future

Year: 2024
Type: conference-paper
Abstract: MeV 2 mA per pulse 550 μs 20 Hz rep.rate PIP Warm linac 400 MeV 25 mA per pulse 35 μs 15 Hz rep.rate Accelerator Complex in PIP-II / LBNF era • With PIP-II Project completed:-New SRF linac doubles Booster injection energy (400 MeV -> 800 MeV).-Booster cycle rate upgraded to 20 Hz from 15 Hz.➢ 1.2 MW beam power from MI at design ramp rate 6 10/16/202
Language: English
Open Access status: gold
OpenAlex ID: W4403854636
FWCI:
Cites:
Cited by:
Related to: 10