Enhanced 9.625-Inches Cementing Practices Proved the Best Well Integrity Solutions and Eliminates the 7-InchesTieback Options in Onshore Oil Field in the United Arab Emirates
Year: 2024
Type: conference-paper
DOI: 10.2118/222852-ms
Authors: Lou Valencerina, Mushtaq Ahmad, Mazin Al Reyami, Mouza AlShehhi, Faisal Gul Khan, Fesarama Felaza, Ugbedeojo Ameh
Institution: Abu Dhabi National Oil (United Arab Emirates)
Language: English
Subfield: Ocean Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: closed
OpenAlex ID: W4404013424
