Work

The First Global Single-Run, Multiple Set-Unset Operation of an Electrically Activated Inflatable Packer Deployed with Hybrid Coiled Tubing: Case Study from Iraq where Real-Time Decisions on Selective Stimulation Treatments were made in a High-Permeability Contrast Reservoir

Year: 2024
Type: conference-paper
Authors: J. Corrales, M. Ramirez, J. R Tellez, M. De Leonardis, F. Aulia, A. D. Al Lami, F. Albattat, X. A. Alarcon, D. Gomez, C. Torres, A. El Beltagy
Language: English
Open Access status: closed
OpenAlex ID: W4404013434
FWCI: 2.659
Cites: 7
Cited by: 2
Related to: 10