An Approach to Safely Install Tie-Back Casing String in Workover Operations Having Existing Lower Completion by Utilization of V0 Stage Tool
Year: 2024
Type: conference-paper
DOI: 10.2118/222617-ms
Institution: Abu Dhabi National Oil (United Arab Emirates)
Language: English
Subfield: Ocean Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: closed
OpenAlex ID: W4404013716
