Year: 2024
Type: article
Abstract: Addressing the resource constraints, such as manpower and equipment, faced by mine backfilling operations, this study proposed an optimization model for backfill scheduling based on the Resource-Constrained Project Scheduling Problem (RCPSP). The model considered backfilling’s multi-process, multi-task, and multi-resource characteristics, aiming to minimize total delay time. Constraints included operational limits, resource requirements, and availability. The goal was to determine optimal resource configurations for each stope’s backfilling steps. A heuristic genetic algorithm (GA) was employed for solution. To handle equipment unavailability, a new encoding/decoding algorithm ensured resource availability and continuous operations. Case verification using real mine data highlights the advantages of the model, showing a 20.6% decrease in completion time, an 8 percentage point improvement in resource utilization, and a 47.4% reduction in overall backfilling delay time compared to traditional methods. This work provides a reference for backfilling scheduling in similar mines and promotes intelligent mining practices.
Source: Minerals
DOI: 10.3390/min14121183
Authors: Yuhang Liu, Guoqing Li, Jie Hou, Chunchao Fan, Chuan Tong, Panzhi Wang
Language: English
Subfield: Control and Systems Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: gold
Estimated APC paid: $2,728
Awards: G1672456847, G586871723
OpenAlex ID: W4404596268
