Work

Analysis of revenue distribution of assembly building under EPC model based on entropy weight-TOPSIS improved Shapley value

Year: 2024
Type: article
Abstract: Prefabricated construction has rapidly developed due to its efficiency and environmental benefits. With the widespread application of the EPC (Engineering, Procurement, and Construction) model, achieving fair and reasonable distribution of profits in prefabricated construction projects under this model has become an urgent issue that needs to be addressed. In response to the limitations of the traditional Shapley value method, this paper introduces input factors, technological factors, and management factors to develop an improved profit distribution model based on entropy-weighted TOPSIS and the Shapley value. A case study is presented to validate the model. Results of the study show that the improved Shapley value method balances the earnings with the actual contribution and achieves a fair and reasonable earnings distribution.
Source: BioResources
Language: English
Open Access status: gold
Estimated APC paid: $1,452
OpenAlex ID: W4404647976
FWCI: 1.263
Cites: 8
Cited by: 4
Related to: 10