Mobile base station site as a virtual power plant for grid stability
Year: 2024
Type: article
Abstract: • First time published VPP with FFR reaction time measurement with production site. • Good overview of virtual power plant usage in mobile network operator space. • Rectifier delay was 5 –8 s which exceeds 1.3 s requirement for FRR product. • Detailed description of test setup and measurements conducted. • Based on the results, vendors can improve offering to meet FFR requirements. Energy grids and markets are in transition. Increased use of renewable energy sources (RES) introduces new stability challenges for power grids. Despite the substantial electrical consumption of mobile networks, they are yet to harness their inherent flexibility for aiding in the stability of the power grid. A noticeable research gap exists concerning measuring full activation time for fast frequency reserve (FFR) product while using batteries from mobile network base stations. Our objective is to demonstrate that mobile operators could use their existing infrastructure to participate in the reserve market of a contemporary power grid. Furthermore, it seeks to determine if the full activation time can meet the requirements of an FFR product. The system consists of a live mobile base station site with a mobile connection to the site, local controller, an existing battery, and a power system that, in combination, can function as part of a power grid balancing system. Our main finding indicates that the rectifier reaction time within an installed base station site infrastructure ranges from 5 to 8 s, and the time when the base station is entirely off from the grid varies from 7 to 10 s. This finding is significant since the activation time is too long for the base station power system controller to be used for FFR. The required full activation time for FFR is less than 1.3 s. In conclusion, power system vendors should investigate improvements for their equipment and software products to enable fast reserve market entry for their existing customers and stay competitive.
Institutions: Aalto University, TeliaSonera (Finland), Nokia (Finland)
Language: English
Subfield: Energy Engineering and Power Technology
Field: Energy
Domain: Physical Sciences
Open Access status: gold
Estimated APC paid: $3,500
OpenAlex ID: W4404852910
