Conceptual Modeling of a Typical Soldier Pile and Tieback Wall Design and Construction

Year: 2024
Type: article
Abstract: The Purpose of this paper is to enable and provide new or young Engineers who will be involved in the design and installation of bank retention systems for, as tied back wall systems with tools how to start and optimize their retention systems for design, installation, and take off materials. This method is obtained from more than twenty years of retention system design experience. An illustration of design steps and calculation through during construction to final stage is included in this paper. It is important to mention that the most critical case in the design might be during construction stage not at the final design case.
Language: English
Open Access status: diamond
OpenAlex ID: W4404934514